Our submission to the Department of Energy and Economic Diversification’s (DEED) 2026 Benchmark Technology Review draft determination focuses on the technology used to set Benchmark Reserve Capacity Prices in Western Australia’s South West Interconnected System (SWIS).
The CEC strongly opposes the proposed removal of the 0.55 tCO₂/MWh emissions-intensity threshold and the selection of a diesel-capable E-class single-cycle gas turbine as the benchmark technology. We consider that this approach does not adequately reflect the environmental and emissions-reduction objectives of the State Electricity Objective and could weaken investment signals for lower-emissions firming technologies.
We recommend reinstating the emissions-intensity threshold or, at a minimum, clearly demonstrating how emissions and environmental outcomes have been considered in the final decision. We also raise concerns about whether the proposed benchmark technology could realistically be delivered for the 2029 capacity year, given long turbine procurement lead times and previous policy signals.
Interested in contributing to similar work?